A new water tank
Fika's new freshwater tank is lined, plumbed in, and nearly ready. A cheap webcam turned out to be the most useful tool for the coating job.
California, USA
Home port for the refit. Fika lives on a mooring in the harbor while we get her ready to go.
Monterey has been home base for the whole refit. Most of the work in the journal so far happened here, on the mooring and in the yard.
Fika's new freshwater tank is lined, plumbed in, and nearly ready. A cheap webcam turned out to be the most useful tool for the coating job.
Fika now has a Dickinson Newport solid fuel stove that can burn anything from driftwood to coal. Cutting a hole in the deck for the chimney taught us something about how she was built.

The aft head is getting a full remodel. First step was stripping and repainting the sole.
A B&G VHF with AIS, two wireless handsets, and a few things worth knowing before you rely on them.
Fika's aluminum fuel tanks were gunked up and had no way in. So I made access hatches, cleaned the tanks out with a pressure washer fed by gravity, and gave them three coats of a fuel-grade epoxy lining.

A rebuilt engine deserves clean fuel. We built a fuel polishing system into the engine room that can filter diesel from any source and send it anywhere aboard.

An all-electric galley looked great on paper. A Thanksgiving dinner aboard a friend's boat changed our minds, and now Fika cooks with a Force 10 propane stove and oven.

Seawater hydrolocked Fika's Perkins 4.236. Several months later it's rebuilt and running, all of it done aboard on the mooring, with the main boom as our crane.

A year and a half of refit work on Fika, from the lithium bank and all-electric galley to rebuilding the bottom of the boat.
